Forced-circulation selection and utility cost calculator

Compare four editable energy scenarios and an indicative heat-transfer area.

Build the duty, then compare energy costs

Edit the proposal assumptions

All defaults below are calculation examples, not guaranteed consumption. Steam is t steam/t water; power is kWh/t water. Use the same boundary, including circulation, vacuum and compression, for all proposals.

Quoted annual fixed costs · optional

Enter annualized capital and planned maintenance in the same currency/year. Leave unknown quotations blank; unknown total costs remain unavailable, rather than treated as zero.

Nothing is sent. Your calculated comparison appears here.

Calculation basis: P = F × xin/xout; V = F − P; Q = V × λ/3600; A = Q × 1000/(U × ΔT). Utilities per tonne = steam ratio × steam price + specific electricity × power price. Area is a latent-load illustration only, not vessel dimensions. It excludes sensible heating, boiling-point elevation, losses, fouling allowances and geometry constraints. Total cost also includes capital, cooling, chemicals, labour, downtime and maintenance.

Decision sequence: characterize the concentrate → confirm circulation, heat and shear limits → obtain feasible steam/MVR/TVR proposals → compare annual hours and full costs. A utility ranking alone cannot select a machine.

Four energy systems, one material duty

Energy arrangementSteam / electricityInvestment and operating considerationsCapacity decision
Single effectDirect steam; circulation and vacuum electricitySimpler thermal integration; compare steam cost over annual hoursNo universal range: define water removal and turndown
Multiple effectVapour reused across effects; more auxiliariesAdditional vessels and area; pressure/temperature budget limits effect countValidate minimum operating load for every effect
TVR assistedMotive steam entrains part of process vapourCompare available steam pressure, load variation and ejector operating envelopeObtain verified ejector design points
MVR assistedCompressor electricity replaces part of thermal input; start-up heat remainsInclude compressor, electrical connection, maintenance and steam-price sensitivityVerify vapour flow and required temperature lift

These are heat strategies, each potentially paired with forced circulation. Obtain project quotations for capital cost and capacity; the table does not invent equipment ratings.

Heat-recovery principle: GEA heating options for thermal separation.

Why circulation changes the material decision

Forced circulation pumps liquid through a heater and separates vapour in a flash vessel. It can be a useful option when viscosity rises or deposits and crystallization need controlled circulation. It still requires sufficient passage size, stable pumping and a validated cleaning procedure.

ConditionFalling filmForced circulation
Clean, low-viscosity liquidEvaluate distribution and thermal exposureExtra recirculation energy may be unnecessary
Fibres / suspended particlesCheck distribution and passage restrictionsReview clearances, wear and blockage; no no-clog guarantee
Concentrate viscosity risesCheck wetting at final concentrationAssess finishing stage, pressure drop and cold restart
Heat or shear sensitivityConsider short liquid hold-upInclude repeated pump passes and total hold-up in trials

Can carrot concentrate use falling film?

The crop name does not decide. Clarification, fibre content, final viscosity and fouling determine the comparison. A fibrous puree may need a different flow path from clarified carrot juice.

How do we keep crystallizing sugar liquor moving?

Measure solubility and crystal size, select passages and circulation from those data, and design start-up, shutdown and flush sequences. High velocity alone does not prove freedom from deposits.

Technical basis: GEA forced circulation and GEA falling film.

Fouling and cleaning are part of the selection

Separate mineral deposits, organic films and crystallization before choosing a cleaning programme. Trend heater duty, normalized heat-transfer coefficient, pressure drop and circulation flow against a clean baseline. Inspect heat surfaces and difficult return paths when those signals change.

Set CIP intervals from product trials and operating history. Validate concentration, time, return temperature, hydraulic action and final rinse; release the circuit only after the agreed hygienic checks. A circuit being cleaned must be safely isolated from product. Continuous plant production requires separate, suitably isolated redundant circuits; it is not an inherent feature of a single evaporator.

A thermal-efficiency decay curve needs dated process measurements. Send clean and end-of-run duty data for assessment instead of relying on an invented curve.